Salmo
River Stream Bank Revetment Project - $6,000
The project will prevent an evulsion
of the present Salmo River channel and prevent flooding and
damage to private property while increasing fish habitat in
a historically channelized section of the Salmo River. The site
is located approximately 6km south of the Village of Salmo.
The river is currently threatening to ‘break’ through
a low lying section of bank and into open fields and private
property. The project will produce a rootwad and LWD revetment
along the low portion of this stream bank. The revetment will
be created to known standards (WRP, Rosgen) and will utilize
local materials to reduce costs. The project itself will create
overhanging and LWD cover for native Salmo River fish species.
The total length of the revetment site is approximately 20 meters
long. The work will be designed to the 1:200 year peak flow
forecast.